PERFORMANCE IMPROVEMENT AND WASTAGE ELIMINATION IN THERMAL POWER PLANT
Author(s):
V HARI KIRAN, LALAM CHETAN BABUBA, L SURAJ
Keywords:
Thermal power plant layout, Coal handling system, Boilers, ash handling system, surface heat losses , boiler blow down & other leakages.
Abstract
Coal power plants are the major source of the power generation in many industries etc. To study and complete understand of thermal power plant in the industry, various systems in the thermal power plant - boiler system and thermal losses. Surface heat loss in the boiler and boiler blow down are analyzed by practical observations. After analysis the values of the systems are compared with OEM (Original equipment manufacturer) values and try to optimize further by performance improvement, wastage elimination and proper thermal insulations in thermal power plant. There is a chance to improve performance and wastage elimination in following systems.
Article Details
Unique Paper ID: 143379

Publication Volume & Issue: Volume 2, Issue 11

Page(s): 128 - 135
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews