PLANNING , SCHEDULING AND RESOURCE OPTIMAIZATION FOR ROAD CONSTRUCTION USING PRIMAVERA
Author(s):
Sushma H, Bhavya S, Rajeeva SJ, G.Narayan
DOI Number:
10.6084/m9.figshare.5288308
Keywords:
Highway Construction, Planning, Scheduling, Resources, Primavera
Abstract
The infrastructure development plays an important role in development of country. Road transport plays an important role in economic growth for a developing country like India. The construction of roads brings about a variety of benefits by all the sectors of economy. Highway constructions are the yardstick to measure the development of country. Project management is the main key role in the construction industry. Any construction project requires proper planning and scheduling for its completion within time and cost. In this project the popular primavera tool/software is used. Planning and scheduling is very important in construction projects for reducing and controlling delays of the project. Substantial amount of time, money, resources are wasted each year in a construction industry due to improper planning and scheduling. With globalization the construction projects have become vast and complex. Planning of such requires huge amount of paper work, which can be reduced with the help of project planning software. Providing good planning, sufficient of flow of resources to a project can be automatically achieved desired result.
Article Details
Unique Paper ID: 144753

Publication Volume & Issue: Volume 4, Issue 3

Page(s): 73 - 84
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews