Review on Effects on Workability of Glass Fiber Reinforced Concrete by Partial Replacement of Cement and Sand with Industrial By- Products
Lokesh Sahu, Honey Gaur
Glass fiber reinforcement, workability, cement, sand
Silica fume as partial replacement with cement as 15% and 30% where sand is replaced with Pond ash by 10% and 20%. I will prepare cubes, cylinders and finally slump test, compressive strength test, splitting tensile strength test and flexible test will be conducted to obtain the necessary results. A large number of trial mixes are required to select the desired optimum replacement of cement and sand by silica fume and pond ash.
Article Details
Unique Paper ID: 145356

Publication Volume & Issue: Volume 4, Issue 9

Page(s): 154 - 157
Article Preview & Download

Go To Issue

Call For Paper

Volume 4 Issue 8

Last Date 25 January 2018

About Us enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on

Social Media

Contact Details

Telephone:704 821 9842/43