Planning, Scheduling and Tracking of Industrial Project Using Primavera P6 Software
Author(s):
Shah Harsh, Mamata Rajgor, Dr Jayeshkumar Pitroda
Keywords:
Planning, Scheduling, Tracking, Project Planning Software, Primavera P6
Abstract
Proper planning and scheduling is very important part of construction projects for reducing and controlling delays of the project. Substantial amounts of time, money and resources are wasted each year in a construction industry due to improper management of construction activities. With globalization the construction projects have become vast and very complex. Planning of such projects requires huge amount of paperwork and time, which can be reduced with the help of project planning software. Providing good planning, proper organization, sufficient flow of resources to a project cannot automatically achieve the desired result. A warning mechanism must be present, which can alert the organization about its possible success and failures throughout the project. The main objectives of this study are to plan, schedule, and track an industrial project with the help of primavera P6 software and study the results generated. Also to recommend measures to the organization for enhancing their project planning skills for similar projects in future.
Article Details
Unique Paper ID: 146359

Publication Volume & Issue: Volume 4, Issue 12

Page(s): 241 - 246
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews