Copyright © 2025 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
@article{145298, author = {Sudhir D.Shinde and Krishna Kharjule}, title = {Estimating & Cost Comparison Between Conventional and Mivan Technique}, journal = {International Journal of Innovative Research in Technology}, year = {}, volume = {4}, number = {8}, pages = {400-403}, issn = {2349-6002}, url = {https://ijirt.org/article?manuscript=145298}, abstract = {Firstly we have considered of mivan technology regarding the method of mivan construction. How to use of mivan system of construction and effective method about cost comparison between of mivan and traditional conventional method. In this paper we have found most effective and economical method regarding about cost, speed of construction, quality and also time saving factor. Discussion of project about cost comparison of mivan system with conventional construction method. After all we have estimate conventional building referring with help of existing plan Pune region area also detailed estimating each contents of mivan building and compare their respective rate of per square feet area and conclude that which method is suitable and economical. The paper also includes that remedial measure of mivan technique. This technique are among the basic objectives determining the successive project are required in term of Speed ,Quality ,Cost and Time Estimating both method of construction and comparing their respective rate with help of DSR (District schedule rate). It conclude must be given due to consider regarding with economy. This paper work we have tried to cover new aspect of mivan technology viz. cost comparison on high quality construction at better speed and reasonable cost.}, keywords = {Conventional building, mivan technique, long wall short wall method, Centre line method.}, month = {}, }
Cite This Article
Submit your research paper and those of your network (friends, colleagues, or peers) through your IPN account, and receive 800 INR for each paper that gets published.
Join NowNational Conference on Sustainable Engineering and Management - 2024 Last Date: 15th March 2024
Submit inquiry