Economic Load Dispatch of power plant in electric generation system using Grey Wolf Optimization
Author(s):
KULDEEP KUMAR SWARNKAR
Keywords:
Abstract
In this paper work, we have applied the Grey Wolf Optimization (GWO) method to solve the Global Economic Load Dispatch Problem (ELDP) by considering with and without transmission losses. The GWO method imitates the superiority ranking and feeding mechanism of grey wolves in nature. For simulating the superiority ranking follows as alpha, beta, omega and delta. For feeding the prey grey wolves follows three steps, in the order of searching, encircling and attacking, are carry out to perform optimization. The intention of ELDP is to curtail the fuel cost for any viable load demand and at the same time to determine the optimal power generation. The potency of the GWO method has been examined on IEEE 30-bus test system with four different load demands by considering four different case studies. The result of the test systems shows, for practical power systems, that the GWO is a better option to solve the ELDP problems.
Article Details
Unique Paper ID: 148016

Publication Volume & Issue: Volume 5, Issue 12

Page(s): 27 - 32
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews