INTEGRATED COST MANAGEMENT SYSTEM FOR DELIVERING CONSTRUCTION PROJECT
Author(s):
KIRAN K, P SELVARAM, M.SAMUEL THANARAJ
Keywords:
Construction project, Integrated cost management system, Primavera, Resources
Abstract
Cost management forms a major discipline in delivering construction projects of different sizes and complexity. Traditional cost management systems are mostly based on principles enacted several decades ago. A notable feature of these traditional cost management systems is that key information required for critical decisions is usually produced too late, and is often too aggregated and configured in a form that is not amenable to the requirements for current project management practice. Other problems associated with traditional cost systems relate to inadequacies in estimating and cost control processes and particularly the lack of integration of cost management across the whole project. The lack of integration means measurements provided by traditional cost systems do not sufficiently align with the goals and objectives set for the project. To address these inherent weaknesses in the current practice of cost management, a number of studies have argued for an integrated alternative that better responds to the information demand and decision making need to be developed. The thesis presents the development of a solution to such an integrated cost management system. The developed solution addresses the gaps of the traditional option by integrating the stages making up the whole life cycle of the project to enable professionals gain an appreciation of the ramifications of any early decisions made. The investigation conducted to support the development of the integrated cost management system and the applied model addresses user requirements and determination of the system boundary conditions for efficacious use by key decision makers. The new cost management system developed achieves a linkage of the planning and control stages into one, with a continuous stream of cost management information in both stages. The integration ensures that cost information is more relevant to the circumstances of the modern project manager
Article Details
Unique Paper ID: 150314

Publication Volume & Issue: Volume 7, Issue 4

Page(s): 316 - 321
Article Preview & Download


Share This Article

Go To Issue



Call For Paper

Volume 7 Issue 3

Last Date 25 August 2020

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews

Contact Details

Telephone:6351679790
Email: editor@ijirt.org
Website: ijirt.org

Policies