Delays in Construction Projects
Author(s):
Vyankatesh S Umbare, Sandeep D salunke, Dinesh C Rodage, Ajay Dahake
Keywords:
GDP,RII,IPMD,INR,DBB.
Abstract
Construction industry is one of the significant contributors to the economic growth and development of country. The problem of delays in construction sector is global phenomenon. Delay in timely completion is one of the main issues in public sector construction project of developing countries. Delay is a condition where a construction project does not complete within the designed schedule. The occurrence of a delay in the construction project is common and significantly affects by enormous way. This report gives the information about the types, causes, classification of causes and mitigation measures to overcome the delays in construction project. This report provides the conceptual framework of the delays in construction project & how to overcome the issues. The methodology includes the questionnaire to the engineers and the contractors from that basis the causes of delays are arranged/ranked by the RII (relative importance index). Study shows the most critical effect of the delay on construction is the cost overrun and because of that termination of project happens.
Article Details
Unique Paper ID: 154738

Publication Volume & Issue: Volume 8, Issue 12

Page(s): 192 - 199
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 11 Issue 1

Last Date for paper submitting for Latest Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews