COST AND TIME OVERRUN ANALYSIS IN CONSTRUCTION INDUSTRY USING QUESTIONNAIRE SURVEY

  • Unique Paper ID: 155704
  • Volume: 9
  • Issue: 1
  • PageNo: 1468-1472
  • Abstract:
  • Delay of a construction project is defined as late completion of the project as compared to the planned schedule. A study is carried out on construction schedule delays and various delay analysis techniques to evaluate the causes of delay and their impacts in the construction project. Then a survey is conducted at various project sites using a questionnaire to find the major causes of delay faced during planning, construction and post construction stages by Client, Contractor, Project manager, and Owner. Then using a ranking method based on relative importance the major cause of delay is found. Thus determination of delays caused in finished construction projects helps in the scheduling of work timetable to a new construction project in an economically efficient and time saving way.

Cite This Article

  • ISSN: 2349-6002
  • Volume: 9
  • Issue: 1
  • PageNo: 1468-1472

COST AND TIME OVERRUN ANALYSIS IN CONSTRUCTION INDUSTRY USING QUESTIONNAIRE SURVEY

Related Articles