COST AND TIME OVERRUN ANALYSIS IN CONSTRUCTION INDUSTRY USING QUESTIONNAIRE SURVEY
Author(s):
G. Palani Selvan, Dr.D.Jayganesh, Dr.S.Robert Ravi
Keywords:
Cost analysis, Time analysis, Construction Industry
Abstract
Delay of a construction project is defined as late completion of the project as compared to the planned schedule. A study is carried out on construction schedule delays and various delay analysis techniques to evaluate the causes of delay and their impacts in the construction project. Then a survey is conducted at various project sites using a questionnaire to find the major causes of delay faced during planning, construction and post construction stages by Client, Contractor, Project manager, and Owner. Then using a ranking method based on relative importance the major cause of delay is found. Thus determination of delays caused in finished construction projects helps in the scheduling of work timetable to a new construction project in an economically efficient and time saving way.
Article Details
Unique Paper ID: 155704

Publication Volume & Issue: Volume 9, Issue 1

Page(s): 1468 - 1472
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 11 Issue 1

Last Date for paper submitting for Latest Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews