CLASH DETECTION USING BIM FOR EFFICIENT CONSTRUCTION TIMELINE
Author(s):
Shubham Narayankar, Subodh Raut, Ashutosh Bhavsar, Sumit Patil, Dipak Chaudhari
Keywords:
Building information modeling (BIM), BIM using Naviswork, 5D modelling, Comparative analysis using BIM, Clash detection, Building Timeliner
Abstract
This project research focused on the impact of BIM in Construction industry using it during the construction phase of the project as well as after completion of the project. Our main objective is to understand BIM flow process for effective coordination, preparing 5D model of G+6 commercial building including cost, quantity, schedule and check BIM process for quality cost and scheduling of construction industry. A case study of project which has followed conventional methods for its project work is compared with BIM techniques for effective planning, visualization & sustainability of project. Using the methodology of modelling the 2D plan into 3D Revit model. After modelling appending it into Naviswork for reducing clashes, proper visualization of project with timeliner tool and a 4D model is prepared. Using Msp for effective planning of activities by assigning proper resources and timeliner..The project had studied element of BIM activities: 3D visualization, Coordination, Construction Planning Management and Monitoring, Record model Energy.
Article Details
Unique Paper ID: 156245

Publication Volume & Issue: Volume 9, Issue 3

Page(s): 183 - 189
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 11 Issue 1

Last Date for paper submitting for Latest Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews