Preparation And Analysis Of Claims On Infrastructural Projects Using Primavera
Author(s):
Mr. Pratik Rajendra Game, Prof. Prof V. S. Dhote, Prof. N. P. Khatmode
Keywords:
Abstract
Construction claims have such high impacts on the project’s cost and time that the contractors should establish the effective claim management in their organizations. Nowadays, the substantially increasing volume of claims are the result of the rising complexity of the projects, the price structure of the construction industry and the legal approach taken by a lot of owners and contractors Claims are becoming an inevitable and unavoidable burden in modern projects involving new technologies, specifications and high expectations from the owner It is, therefore, imperative for all the parties to be fully acquainted with the procedures and systems, including recourse to certain preventive actions as found necessary and required. Changes in the construction field can be consolidated directly or converted to a full process project. This study aims to identify the method of using the PCM program and Primavera P6 to prepare the claims in a short time with less effort to produce fully documented claims
Article Details
Unique Paper ID: 163577

Publication Volume & Issue: Volume 10, Issue 11

Page(s): 0 - 0
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 10 Issue 10

Last Date for paper submitting for March Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews