Experimental Investigation on Artificially made Continuous Beam Under Cyclic Loading
Author(s):
CHENTHURPRIYA.K, Dr.P. Saravana Kumar, Dr.D.Sathies Kumar, Mrs.S.Shayamala Gowri
Keywords:
artificially made RC continuous bridge, cumulative ductility factor values, cyclic loading.
Abstract
A continuous span is a bridge segment with structural members that cross over one or more substructure units without a break. The structural members may have to be spliced to obtain the necessary length; however, they are still considered one-piece members. The advantages of continuous girders that are statically indeterminate structure have been established but the experimental behavior of artificially made continuous beam is not found .Hence this experimental investigation is taken off to access the behavior of continuous beam with artificially made continuity on the load carrying capacity, the cumulative ductility factor values, the cumulative energy absorption values, Stiffness and deflection of Made Continuous Beam under cyclic loading are found out and compared with the conventional one.
Article Details
Unique Paper ID: 167579

Publication Volume & Issue: Volume 11, Issue 3

Page(s): 1463 - 1467
Article Preview & Download


Share This Article

Join our RMS

Conference Alert

NCSEM 2024

National Conference on Sustainable Engineering and Management - 2024

Last Date: 15th March 2024

Call For Paper

Volume 11 Issue 1

Last Date for paper submitting for Latest Issue is 25 June 2024

About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on [email protected]

Social Media

Google Verified Reviews