Copyright © 2025 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
@article{155704, author = {G. Palani Selvan and Dr.D.Jayganesh and Dr.S.Robert Ravi}, title = {COST AND TIME OVERRUN ANALYSIS IN CONSTRUCTION INDUSTRY USING QUESTIONNAIRE SURVEY }, journal = {International Journal of Innovative Research in Technology}, year = {}, volume = {9}, number = {1}, pages = {1468-1472}, issn = {2349-6002}, url = {https://ijirt.org/article?manuscript=155704}, abstract = {Delay of a construction project is defined as late completion of the project as compared to the planned schedule. A study is carried out on construction schedule delays and various delay analysis techniques to evaluate the causes of delay and their impacts in the construction project. Then a survey is conducted at various project sites using a questionnaire to find the major causes of delay faced during planning, construction and post construction stages by Client, Contractor, Project manager, and Owner. Then using a ranking method based on relative importance the major cause of delay is found. Thus determination of delays caused in finished construction projects helps in the scheduling of work timetable to a new construction project in an economically efficient and time saving way.}, keywords = {Cost analysis, Time analysis, Construction Industry}, month = {}, }
Cite This Article
Submit your research paper and those of your network (friends, colleagues, or peers) through your IPN account, and receive 800 INR for each paper that gets published.
Join NowNational Conference on Sustainable Engineering and Management - 2024 Last Date: 15th March 2024
Submit inquiry