DESIGN OF PRE ENGINEERED BUILDING USING STAAD PRO

  • Unique Paper ID: 167817
  • Volume: 11
  • Issue: 4
  • PageNo: 556-560
  • Abstract:
  • To design and analyze the casting yard under the concept of Pre-Engineered Building (PEB) involves pre designed and pre-fabricated steel building system. Casting Yard is a confined place where all the concrete structures such as I-girder, beams and other structural members are casted and transported to the site. PEB are fabricated based on the requirements and functional aspects of the building. The use of the optimal least section leads to effective saving of steel and utilization of non-prismatic rigid frames with slender elements. Tapered I section made with built up thin plates are used. Comparing the Pre-Engineered steel Buildings with Conventional Steel Buildings it is time and cost efficient. PEB construction is 30 to 40% faster than masonry construction and conventional steel construction

Copyright & License

Copyright © 2025 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

BibTeX

@article{167817,
        author = {Ranjith Raja P and Dr. Sundari S},
        title = {DESIGN OF PRE ENGINEERED BUILDING USING STAAD PRO},
        journal = {International Journal of Innovative Research in Technology},
        year = {2024},
        volume = {11},
        number = {4},
        pages = {556-560},
        issn = {2349-6002},
        url = {https://ijirt.org/article?manuscript=167817},
        abstract = {To design and analyze the casting yard under the concept of Pre-Engineered Building (PEB) involves pre designed and pre-fabricated steel building system. Casting Yard is a confined place where all the concrete structures such as I-girder, beams and other structural members are casted and transported to the site. PEB are fabricated based on the requirements and functional aspects of the building. The use of the optimal least section leads to effective saving of steel and utilization of non-prismatic rigid frames with slender elements. Tapered I section made with built up thin plates are used. Comparing the Pre-Engineered steel Buildings with Conventional Steel Buildings it is time and cost efficient. PEB construction is 30 to 40% faster than masonry construction and conventional steel construction},
        keywords = {PEB, Purlin, Rafter, Column, Footing.},