Strengthening of Old Excavated and Concrete lined Head Race Tunnel of Tehri Pumped Storage Plant (1000 MW)

  • Unique Paper ID: 189400
  • Volume: 12
  • Issue: 7
  • PageNo: 6027-6034
  • Abstract:
  • No Abstract Found

Copyright & License

Copyright © 2026 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

BibTeX

@article{189400,
        author = {Rajeev Prasad and kshitij Mudgal},
        title = {Strengthening of Old Excavated and Concrete lined Head Race Tunnel of Tehri Pumped Storage Plant (1000 MW)},
        journal = {International Journal of Innovative Research in Technology},
        year = {2025},
        volume = {12},
        number = {7},
        pages = {6027-6034},
        issn = {2349-6002},
        url = {https://ijirt.org/article?manuscript=189400},
        abstract = {},
        keywords = {Tehri, Pumped Storage Plant, Head Race Tunnel, Concrete Lining, Epoxy, Hydropower, First Filling, Surge Shaft.},
        month = {December},
        }

Cite This Article

Prasad, R., & Mudgal, K. (2025). Strengthening of Old Excavated and Concrete lined Head Race Tunnel of Tehri Pumped Storage Plant (1000 MW). International Journal of Innovative Research in Technology (IJIRT), 12(7), 6027–6034.

Related Articles