IMPROVING CONSTRUCTION PROJECT DURATION THROUGH MANUAL CORRECT-RISING OF CPM AND PERT WITH PRIMAVERA P6 AND MATLAB-BASED OPTIMIZATION

  • Unique Paper ID: 209883
  • Volume: 13
  • Issue: 5
  • PageNo: 3759-3764
  • Abstract:
  • This research paper presents an applied scheduling framework for improving construction project duration through manual correct-rising of the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), supported by Primavera P6 and MATLAB-based optimization. The study is developed from a residential construction scheduling case in Pune, with the Belmont Skyverse project used as the primary case study. The baseline schedule consists of 96 activities distributed across substructure, superstructure, finishing and MEP phases. The research first develops an Excel-based baseline, then applies CPM to identify the deterministic critical path and PERT to account for duration uncertainty using optimistic, most-likely and pessimistic estimates. The correct-rising procedure reviews activity durations, logical dependencies, sequencing, float values and resource constraints to remove unrealistic links and reduce idle time. Primavera P6 is used for schedule validation and resource-leveling, while MATLAB-based Linear Programming and Artificial Neural Network logic supports resource allocation improvement. Results show that the original 789-day baseline duration was reduced to 735 days under the corrected CPM schedule, saving 54 days. Resource utilization improved from 63% to 90%, and the Schedule Efficiency Index improved from 0.74 to 0.96. The PERT expected duration was 747 days, reflecting uncertainty in activity execution. The study concludes that manual correct-rising, when combined with professional scheduling software and optimization tools, provides a practical approach for reducing construction duration without compromising feasibility or project control.

Copyright & License

Copyright © 2026 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

BibTeX

@article{209883,
        author = {Ankita Mohan Karne},
        title = {IMPROVING CONSTRUCTION PROJECT DURATION THROUGH MANUAL CORRECT-RISING OF CPM AND PERT WITH PRIMAVERA P6 AND MATLAB-BASED OPTIMIZATION},
        journal = {International Journal of Innovative Research in Technology},
        year = {2026},
        volume = {13},
        number = {5},
        pages = {3759-3764},
        issn = {2349-6002},
        url = {https://ijirt.org/article?manuscript=209883},
        abstract = {This research paper presents an applied scheduling framework for improving construction project duration through manual correct-rising of the Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), supported by Primavera P6 and MATLAB-based optimization. The study is developed from a residential construction scheduling case in Pune, with the Belmont Skyverse project used as the primary case study. The baseline schedule consists of 96 activities distributed across substructure, superstructure, finishing and MEP phases. The research first develops an Excel-based baseline, then applies CPM to identify the deterministic critical path and PERT to account for duration uncertainty using optimistic, most-likely and pessimistic estimates. The correct-rising procedure reviews activity durations, logical dependencies, sequencing, float values and resource constraints to remove unrealistic links and reduce idle time. Primavera P6 is used for schedule validation and resource-leveling, while MATLAB-based Linear Programming and Artificial Neural Network logic supports resource allocation improvement. Results show that the original 789-day baseline duration was reduced to 735 days under the corrected CPM schedule, saving 54 days. 
Resource utilization improved from 63% to 90%, and the Schedule Efficiency Index improved from 0.74 to 0.96. The PERT expected duration was 747 days, reflecting uncertainty in activity execution. The study concludes that manual correct-rising, when combined with professional scheduling software and optimization tools, provides a practical approach for reducing construction duration without compromising feasibility or project control.},
        keywords = {CPM, PERT, Correct-Rising Method, Primavera P6, MATLAB Optimization, Construction Scheduling, Critical Path, Project Duration, Resource Allocation, Schedule Efficiency.},
        month = {October},
        }

Cite This Article

Karne, A. M. (2026). IMPROVING CONSTRUCTION PROJECT DURATION THROUGH MANUAL CORRECT-RISING OF CPM AND PERT WITH PRIMAVERA P6 AND MATLAB-BASED OPTIMIZATION. International Journal of Innovative Research in Technology (IJIRT), 13(5), 3759–3764.

Related Articles