author = {Kanishka Malhotra and Kanak Agarwal and Pranjal Luthra and Nikhil V},
title = {BEYOND TICKET SALES: FINANCIAL RISK MANAGEMENT AND STRATEGIC PROJECT PLANNING IN MULTI-CITY LIVE ENTERTAINMENT TOURS},
journal = {International Journal of Innovative Research in Technology},
year = {2026},
volume = {13},
number = {6},
pages = {3744-3750},
issn = {2349-6002},
url = {https://ijirt.org/article?manuscript=211157},
abstract = {Live entertainment tours combine uncertain ticket demand with substantial advance commitments, geographically dispersed operations and tight scheduling dependencies. These characteristics create a managerial problem that is simultaneously financial and operational: a tour may appear profitable under a base-case forecast yet remain vulnerable to changes in attendance, production costs, travel requirements and venue arrangements. This paper examines how financial risk management can be integrated with strategic project planning in a multi-city live entertainment tour. It uses a documentary case-analysis approach based on a student project summary describing an 11-show, six-city Australian tour plan and its stated financial projections of AUD 23.9 million in revenue and AUD 12.3 million in costs at 85 per cent occupancy. Because the underlying workbook, ticket-price assumptions, cost breakdown and actual performance records were not available for independent inspection, these figures are treated as planning estimates rather than realized results. An illustrative sensitivity model tests the effect of lower and higher occupancy and cost escalation, holding the baseline cost estimate constant except in the specified cost-shock scenario. The analysis indicates that the projected surplus is substantial under the stated base case, but its reliability cannot be established without a transparent cost structure, contribution-margin assumptions and risk-adjusted cash-flow forecast. The paper proposes an integrated framework linking demand scenarios, cost contingency, schedule risk, change control and management accountability. It contributes a practical decision framework for project managers and finance teams responsible for complex touring events, while identifying the data required for a stronger empirical study.},
keywords = {live entertainment; project finance; financial risk; sensitivity analysis; project management; cost contingency; capacity utilization; event management},
month = {November},
}
Submit your research paper and those of your network (friends, colleagues, or peers) through your IPN account, and receive 800 INR for each paper that gets published.
Join NowNational Conference on Sustainable Engineering and Management - 2024 Last Date: 15th March 2024
Submit inquiry