ANALYSIS OF FACTORS INFLUENCING FOR MATERIAL WASTAGE & QUALITY MANAGEMENT IN CONSTRUCTION PROJECT

  • Unique Paper ID: 176519
  • Volume: 11
  • Issue: 11
  • PageNo: 7799-7804
  • Abstract:
  • The construction industry is one of the industries through which physical development of nation is achieved, and it is truly the locomotive of the national economy. The more resources, engineering, labor, materials, equipment, capital, and market exchange are provided through this industry to the national economy. The increasing complexity of infrastructure projects and the environment within which they are constructed place greater demand on construction managers to deliver projects on time, within the planned budget and with high quality. The successful execution of construction projects and keeping them within estimated cost and prescribed schedules depend on a methodology that requires sound engineering judgment. To the dislike of owners, contractors and consultants, however, many projects experience extensive delays and thereby exceed initial time and cost estimates. Therefore, improving construction efficiency by means of timeliness would certainly contribute to cost savings for the country as a whole. Efforts directed to time effectiveness were associated with managing time and materials, which in this study were approached via investigating time and material wastages of construction projects.

Copyright & License

Copyright © 2025 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

BibTeX

@article{176519,
        author = {Mr Kapil Ramesh Patil and Dr  Mrs  P  M  Alandkar and Mr A B Khemalapure},
        title = {ANALYSIS OF FACTORS INFLUENCING FOR MATERIAL WASTAGE & QUALITY MANAGEMENT IN CONSTRUCTION PROJECT},
        journal = {International Journal of Innovative Research in Technology},
        year = {2025},
        volume = {11},
        number = {11},
        pages = {7799-7804},
        issn = {2349-6002},
        url = {https://ijirt.org/article?manuscript=176519},
        abstract = {The construction industry is one of the industries through which physical development of nation is achieved, and it is truly the locomotive of the national economy. The more resources, engineering, labor, materials, equipment, capital, and market exchange are provided through this industry to the national economy. The increasing complexity of infrastructure projects and the environment within which they are constructed place greater demand on construction managers to deliver projects on time, within the planned budget and with high quality. The successful execution of construction projects and keeping them within estimated cost and prescribed schedules depend on a methodology that requires sound engineering judgment. To the dislike of owners, contractors and consultants, however, many projects experience extensive delays and thereby exceed initial time and cost estimates. Therefore, improving construction efficiency by means of timeliness would certainly contribute to cost savings for the country as a whole. Efforts directed to time effectiveness were associated with managing time and materials, which in this study were approached via investigating time and material wastages of construction projects.},
        keywords = {Construction, Infrastructure, Material Wastage, Budget, Methodology},
        month = {May},
        }

Cite This Article

  • ISSN: 2349-6002
  • Volume: 11
  • Issue: 11
  • PageNo: 7799-7804

ANALYSIS OF FACTORS INFLUENCING FOR MATERIAL WASTAGE & QUALITY MANAGEMENT IN CONSTRUCTION PROJECT

Related Articles