METHODOLOGY OF CONSTRUCTION OF RAILWAY TUNNEL
Author(s):
parth talaviya, vikas bhavsar
ISSN:
2349-6002
Cite This Article:
METHODOLOGY OF CONSTRUCTION OF RAILWAY TUNNELInternational Journal of Innovative Research in Technology(www.ijirt.org) ,ISSN: 2349-6002 ,Volume 6 ,Issue 2 ,Page(s):88-89 ,July 2019 ,Available :IJIRT148464_PAPER.pdf
Keywords:
tunnel construction, spiral tunnel, slope tunnel, shortcrete
Abstract
Dhorajia Projects & Construction JV (DPC) to perform a geotechnical investigation and structural design of the proposed tunnels construction at the project site. The purpose of this geotechnical investigation is to obtain information on the subsoil conditions by drilling boreholes and performing in-situ and laboratory tests on selected soil or rock samples. These information’s obtained is used to provide geotechnical parameters recommendations for tunnel design at the project site. It is understood that, Client This report is presented herewith summarizes the results of the core drilling and core processing activities completed at three nos. of boreholes with moderate depth in vertical direction, analyses based on thorough study of the geotechnical investigation results. A complete geotechnical assessment was undertaken to indicate the nature and behavior of soil/rock under the application applicable load conditions on proposed tunnel near Pachola, Aklera, Dist. Jhalawar, Rajasthan.
Article Details
Unique Paper ID: 148464

Publication Volume & Issue: Volume 6, Issue 2

Page(s): 88 - 89
Article Preview & Download




Go To Issue



Call For Paper

Volume 6 Issue 6

Last Date 25 November 2019


About Us

IJIRT.org enables door in research by providing high quality research articles in open access market.

Send us any query related to your research on editor@ijirt.org

Social Media

Google Verified Reviews

Contact Details

Telephone:8200 61 5067
Email: editor@ijirt.org
Website: ijirt.org

Policies