METHODOLOGY OF CONSTRUCTION OF RAILWAY TUNNEL

  • Unique Paper ID: 148464
  • Volume: 6
  • Issue: 2
  • PageNo: 88-89
  • Abstract:
  • Dhorajia Projects & Construction JV (DPC) to perform a geotechnical investigation and structural design of the proposed tunnels construction at the project site. The purpose of this geotechnical investigation is to obtain information on the subsoil conditions by drilling boreholes and performing in-situ and laboratory tests on selected soil or rock samples. These information’s obtained is used to provide geotechnical parameters recommendations for tunnel design at the project site. It is understood that, Client This report is presented herewith summarizes the results of the core drilling and core processing activities completed at three nos. of boreholes with moderate depth in vertical direction, analyses based on thorough study of the geotechnical investigation results. A complete geotechnical assessment was undertaken to indicate the nature and behavior of soil/rock under the application applicable load conditions on proposed tunnel near Pachola, Aklera, Dist. Jhalawar, Rajasthan.

Copyright & License

Copyright © 2025 Authors retain the copyright of this article. This article is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

BibTeX

@article{148464,
        author = {parth talaviya and vikas bhavsar},
        title = {METHODOLOGY OF CONSTRUCTION OF RAILWAY TUNNEL},
        journal = {International Journal of Innovative Research in Technology},
        year = {},
        volume = {6},
        number = {2},
        pages = {88-89},
        issn = {2349-6002},
        url = {https://ijirt.org/article?manuscript=148464},
        abstract = {Dhorajia Projects & Construction JV (DPC) to perform a geotechnical investigation and structural design of the proposed tunnels construction at the project site. The purpose of this geotechnical investigation is to obtain information on the subsoil conditions by drilling boreholes and performing in-situ and laboratory tests on selected soil or rock samples. These information’s obtained is used to provide geotechnical parameters recommendations for tunnel design at the project site. It is understood that, Client This report is presented herewith summarizes the results of the core drilling and core processing activities completed at three nos. of boreholes with moderate depth in vertical direction, analyses based on thorough study of the geotechnical investigation results. A complete geotechnical assessment was undertaken to indicate the nature and behavior of soil/rock under the application applicable load conditions on proposed tunnel near Pachola, Aklera, Dist. Jhalawar, Rajasthan.},
        keywords = {tunnel construction, spiral tunnel, slope tunnel, shortcrete},
        month = {},
        }

Cite This Article

  • ISSN: 2349-6002
  • Volume: 6
  • Issue: 2
  • PageNo: 88-89

METHODOLOGY OF CONSTRUCTION OF RAILWAY TUNNEL